Russell Blvd Elementary Addition

Demolition work generally consists of removal of paving, site items, ceilings, lights, doors, walls and additional items as described further in the demolition specification and drawings. Construction work generally consists of replacement of existing ceilings, lights, walls, flooring that were removed along with a new concrete block and brick addition. Work includes new finishes, casework, markerboards, tackboards, ceilings, lights, exterior paving, related mechanical / electrical / plumbing work and additional items as described further in the specifications and drawings.
Specifications (click to expand/collapse)
Name Date Size
00-Bidding Documents 1/11/2022 3.2 MB
01-Full Spec 1/11/2022 46.2 MB
02-Division 00 1/11/2022 42.3 MB
03-Division 01 1/11/2022 136.1 KB
04-Division 02 1/11/2022 22.0 KB
05-Division 03 1/11/2022 55.5 KB
06-Division 04 1/11/2022 67.5 KB
07-Division 05 1/11/2022 83.0 KB
08-Division 06 1/11/2022 30.5 KB
09-Division 07 1/11/2022 129.8 KB
10-Division 08 1/11/2022 105.9 KB
11-Division 09 1/11/2022 104.4 KB
12-Division 10 1/11/2022 43.2 KB
13-Division 12 1/11/2022 23.8 KB
14-Division 14 1/11/2022 84.5 KB
15-Division 21 1/11/2022 95.2 KB
16-Division 22 1/11/2022 570.9 KB
17-Division 23 1/11/2022 1.1 MB
18-Division 26 1/11/2022 342.0 KB
19-Division 28 1/11/2022 132.6 KB
20-Division 31 1/11/2022 153.2 KB
21-Division 32 1/11/2022 750.8 KB
22-Division 33 1/11/2022 193.4 KB