Callaway Hills Elementary Pumpstation & Forcemain

General construction of wastewater pump station and forcemain including sitework, yard piping, process piping and equipment. Construction of a package Pump Station. Construction of sanitary forcemain. Sewer Lagoon closure. Providing traffic control for public and access for Contractors equipment. Obtaining all permits for construction of Work not obtained by Engineer or Owner. Removing all debris and excess materials from Project Site generated by construction Work. Restoring areas disturbed by construction to original condition or as specified by Contract Documents.
Specifications (click to expand/collapse)
Name Date Size
00-Bidding Documents 5/6/2022 2.8 MB
01-Full Spec 5/6/2022 26.3 MB
02-Division 00 5/6/2022 10.1 MB
03-Division 01 5/6/2022 2.1 MB
04-Division 02 5/6/2022 248.9 KB
05-Division 03 5/6/2022 597.7 KB
06-Division 05 5/6/2022 251.0 KB
07-Division 07 5/6/2022 193.6 KB
08-Division 09 5/6/2022 250.1 KB
09-Division 26 5/6/2022 885.4 KB
10-Division 31 5/6/2022 773.1 KB
11-Division 32 5/6/2022 517.1 KB
12-Division 33 5/6/2022 1.1 MB
13-Division 40 5/6/2022 2.6 MB
14-Division 43 5/6/2022 206.2 KB