Hickman High Natatorium HVAC Replacement

Construction work generally consists of removal of existing mechanical equipment and related components and installation of new equipment and related components and additional items as described further in the specifications and drawings.
  Specifications (click to expand/collapse)
Name Date Size
00-Bidding Documents 8/22/2019 415.2 KB
01-Full Spec 8/22/2019 16.9 MB
02-Division 00 8/22/2019 6.5 MB
03-Division 01 8/22/2019 1.8 MB
04-Division 22 8/22/2019 1.5 MB
05-Division 23 8/22/2019 5.6 MB
06-Division 26 8/22/2019 1.5 MB