TSU Greenwood Center Site Development

Site development at the Greenwood Center, including new parking lot and sidewalks, grading and utilities.
  Issued for Bid (click to expand/collapse)
Name Date Size
01-C001-Cover 9/5/2019 1.9 MB
02-C051-Demolition Plan 9/5/2019 633.3 KB
03-C081-Erosion Control Plan 9/5/2019 658.1 KB
04-C101-Site Plan 9/5/2019 528.8 KB
05-C102-Site Plan 9/5/2019 553.0 KB
06-C103-Site Plan 9/5/2019 439.9 KB
07-C104-Overall Site Grading Plan 9/5/2019 691.7 KB
08-C201-Storm Profiles 9/5/2019 623.4 KB
09-C202-Storm Profiles 9/5/2019 632.4 KB
10-C203-Storm Profiles 9/5/2019 783.7 KB
11-C204-Sanitary Sewer Service Profile 9/5/2019 549.0 KB
12-C501-Details 9/5/2019 505.2 KB
13-C502-Details 9/5/2019 697.7 KB
14-C503-Details 9/5/2019 412.7 KB
15-S001-Structural General Notes 9/5/2019 180.5 KB
16-S100-Framing Plans 9/5/2019 296.0 KB
17-S130-Sections 9/5/2019 203.7 KB
18-S131-Sections 9/5/2019 283.7 KB
19-E1.00-Fiber Network Additions 9/5/2019 360.9 KB
20-E1.01-Overall Site Plan Electrical 9/5/2019 262.7 KB
21-ME2.01-Basement & First Floor Plan MEP 9/5/2019 224.3 KB