The State Tech College of Missouri Informational Technology Center Ground Loop Water Temp Solution

Construction work generally consists of the installation of a new fluid cooler and associated piping required to connect into the existing ground-source water loop piping, and related components and additional items as described further in the specifications and drawings.

Status

Bidding Closed

Prebid Date11/19/19 10:00 am

Bid Date12/3/19 3:00 pm

Company & Contacts

Timberlake Engineering

Mark Timberlake   mark@timberlakeengineering.com

Location

Linn, MO

Documents can be ordered online or by contacting ADS at 1400 Forum Blvd, Suite 7A, Columbia, MO 65203, Ph: (573) 446-7768, Email: orders@adsmo.net. A hard copy set of documents is available for a NON-refundable deposit of $75, any check is payable to ADS and a copy can be emailed to us before you mail it. A download is available for a purchase of $40. Either can be paid online with a credit card.

Shipping is an additional $20

ALL CREDIT CARD PAYMENTS ARE SUBJECT TO $3 CONVENIENCE FEE.