E1906-01 Window Replacement-Administration Building-Wheeler Hall-Missouri School for the Deaf

The project includes the removal and replacement of all exterior aluminum windows in approximately 90 openings, with new non- operable aluminum windows. There are two openings with five windows, 45 openings with three windows, 27 openings with two windows, and 18 openings with one window. The project also includes removal and replacement of two aluminum storefronts with five new aluminum windows each, and the removal of a hollow metal double door and frame with transoms and sidelights to be replaced with a new aluminum storefront door and frame. Demolition will include asbestos abatement with third party air monitoring on the interior of the windows, storefronts, and hollow metal door system.

Status

Accepting Bids

Prebid Date1/7/20 10:00 am

Bid Date1/23/20 1:30 pm

Company & Contacts

The State of Missouri Office of Administration

Brad Schaefer   (573) 526-0136

Location

Fulton, MO

Documents can be ordered online or by contacting ADS at 1400 Forum Blvd, Suite 7A, Columbia, MO 65203, Ph: (573) 446-7768, Email: orders@adsmo.net. A hard copy set of documents is available for a refundable deposit of $30, CHECK ONLY, payable to ADS and a copy can be emailed to us before you mail them. A download is available for a purchase (non-refundable) of $30 that can be paid via credit card.

All bids should be submitted using Missouri Buys at THIS WEBSITE.