49-01-A7 Busch (August A) Memorial CA HVAC Controls & HVAC Replacement

The project includes but is not limited to the following: demolition of existing HVAC system. Furnish and installnew web based direct digital control system, sensors, heat pumps, variable air volume boxes with actuators, boilers, cooling tower, water heater and fan. other equipment may be reused if compatible with the new system including actuators. Wiring will need to be replaced for the new system. Training of Owner's personnel on the new system.
  Specifications (click to expand/collapse)
Name Date Size
00-Bidding Documents 2/11/2020 611.5 KB
01-Full Spec 2/11/2020 8.6 MB
02-Division 00 2/11/2020 4.5 MB
03-Division 01 2/11/2020 1.2 MB
04-Division 22 2/11/2020 172.2 KB
05-Division 23 2/11/2020 1.7 MB
06-Division 26 2/11/2020 1.1 MB