53-02-34 Hunnewell Lake Conservation Area Sediment & Nutrient Trapping Basin Renovation

The project includes all materials, labor and equipment necessary to renovate the existing concrete water control structure and raise the existing county roadway. The contract includes all site work, earthwork, concrete and metal fabrication as shown on the contract drawings.
  Issued for Bid (click to expand/collapse)