Sarah Drive Bridge Replacement

The project consists of the removal and replacement of concrete box. Replacement structure will be a 12x5.5 precast box culvert, grading, and pavement replacement. The City reserves the right to analyze the bids received and select the bid that best fits in the allotted budget and award contract on that basis.

Status

Bidding Closed

Bid Date7/1/20 2:00 pm

Company & Contacts

Allstate Consultants LLC

Derin Campbell   dcampbell@allstateconsultants.net

Location

Ashland, MO

Documents can be ordered online or by contacting ADS at 1400 Forum Blvd, Suite 7A, Columbia, MO 65203, Ph: (573) 446-7768, Email: orders@adsmo.net for a NON-refundable deposit of $45, (electronic or hard copy) and can be paid via credit card. Any checks are payable to ADS and a copy can be emailed to us before you mail.

Shipping is an additional $20

ALL CREDIT CARD PAYMENTS ARE SUBJECT TO $3 CONVENIENCE FEE.