Sarah Drive Bridge Replacement

The project consists of the removal and replacement of concrete box. Replacement structure will be a 12x5.5 precast box culvert, grading, and pavement replacement. The City reserves the right to analyze the bids received and select the bid that best fits in the allotted budget and award contract on that basis.
  Specifications (click to expand/collapse)
Name Date Size
00-Bidding Documents 6/1/2020 399.0 KB
01-Project Manual 6/1/2020 3.1 MB