61-19-H7 Conservation Commission Headquarters Distribution Center Roof Replacement

The project consists of the exterior renovation including the replacement of the existing shingle roof with a standing seam metal roof, replacing the EPDM roof in kind, replacing windows and the existing siding with an exposed fastener metal wall panel. The interior renovation of this building includes casework, railing, and compliance upgrades.
  Issued for Bid (click to expand/collapse)
Name Date Size
00-Full PDF of Plans 6/11/2020 14.5 MB
01-CVR_Cover Sheet 6/11/2020 328.8 KB
02-G-001_General Information 6/11/2020 634.9 KB
03-G-101_Life Safety and Code Analysis 6/11/2020 1.6 MB
04-A-101_Demo Plan 6/11/2020 467.5 KB
05-A-102_Roof Demo Plan 6/11/2020 676.3 KB
06-A-103_Demo Elevations 6/11/2020 1.9 MB
07-A-104_Floor Plan 6/11/2020 638.6 KB
08-A-105_Roof Plan 6/11/2020 1.0 MB
09-A-201_Elevations 6/11/2020 2.0 MB
10-A-401_Enlarged Plans and Elevations 6/11/2020 575.0 KB
11-A-501_Sections and Details 6/11/2020 661.5 KB
12-A-502_Roof, Siding and Stair Details 6/11/2020 723.9 KB
13-A-503_Interior Details 6/11/2020 1.2 MB
14-A-504_Window Details 6/11/2020 670.3 KB
15-E-001_Electrical Legend 6/11/2020 756.3 KB
16-E-101_Emergency and Exit Lighting 6/11/2020 881.7 KB