61-19-H7 Conservation Commission Headquarters Distribution Center Roof Replacement

The project consists of the exterior renovation including the replacement of the existing shingle roof with a standing seam metal roof, replacing the EPDM roof in kind, replacing windows and the existing siding with an exposed fastener metal wall panel. The interior renovation of this building includes casework, railing, and compliance upgrades.
  Specifications (click to expand/collapse)
Name Date Size
00-Bidding Documents 6/11/2020 801.7 KB
01-Full Spec 6/11/2020 12.7 MB
02-Division 00 6/11/2020 4.3 MB
03-Division 01 6/11/2020 2.0 MB
04-Division 03 6/11/2020 640.8 KB
05-Division 05 6/11/2020 830.1 KB
06-Division 06 6/11/2020 1.1 MB
07-Division 07 6/11/2020 2.2 MB
08-Division 08 6/11/2020 344.8 KB
09-Division 09 6/11/2020 321.9 KB
10-Division 22 6/11/2020 116.6 KB
11-Division 26 6/11/2020 1.0 MB