28-09JUL20 Waters Edge Drainage Improvements-Phase II-2020

Remove the CMP outlet pipes from the existing stormwater system at two locations. Reconstruct the two outlet systems by tying them into the existing inlets using HP Storm pipe and installing new concrete junction boxes. Project also includes tree removal, grading, and restoration work.
  Specifications (click to expand/collapse)
Name Date Size
00-Bidding Documents 6/15/2020 757.3 KB
01-Project Manual 6/15/2020 4.5 MB