83-15-10 Three Creeks Conservation Area Nature School Pavilion

The project includes, but is not limited to: mobilization and demobilization, construction survey staking, information sign, clearing, grubbing, tree removal, erosion control, reinforced concrete pavement, pavilion, pavilion concrete, coordinate privy install, earth moving, aggregate-surfaced roadway, geotextile, geogrid, metal culvert, sign posts, and seed and mulch.
  Issued for Bid (click to expand/collapse)
Name Date Size
00-Full PDF of Plans 9/9/2020 4.7 MB
01-G-000_Cover Sheet 9/9/2020 134.2 KB
02-G-001_General Information 9/9/2020 418.8 KB
03-C-101_Site Plan 9/9/2020 343.8 KB
04-C-102_Plan & Profile 9/9/2020 292.9 KB
05-C-501_Details 9/9/2020 324.0 KB
06-C-701_Cross Sections 9/9/2020 163.8 KB
07-A-101_Plan Elevation & Sections 9/9/2020 283.4 KB
08-A-501_Roof Framing Plan & Details 9/9/2020 183.4 KB
09-V-101_Existing Site Plan 9/9/2020 587.7 KB
10-Z-508_Construction Staking Details 9/9/2020 1.0 MB
11-Z-517_Temporary Erosion Control 9/9/2020 1.3 MB