83-15-10 Three Creeks Conservation Area Nature School Pavilion

The project includes, but is not limited to: mobilization and demobilization, construction survey staking, information sign, clearing, grubbing, tree removal, erosion control, reinforced concrete pavement, pavilion, pavilion concrete, coordinate privy install, earth moving, aggregate-surfaced roadway, geotextile, geogrid, metal culvert, sign posts, and seed and mulch.
  Specifications (click to expand/collapse)
Name Date Size
00-Bidding Documents 9/9/2020 598.3 KB
01-Full Spec 9/9/2020 13.0 MB
02-Divison 00 9/9/2020 8.9 MB
03-Divison 01 9/9/2020 893.7 KB
04-Divison 03 9/9/2020 208.4 KB
05-Divison 04 9/9/2020 139.5 KB
06-Divison 06 9/9/2020 393.6 KB
07-Divison 07 9/9/2020 416.9 KB
08-Divison 09 9/9/2020 244.6 KB
09-Divison 10 9/9/2020 118.9 KB
10-Divison 31 9/9/2020 693.7 KB
11-Divison 32 9/9/2020 507.3 KB
12-Divison 33 9/9/2020 880.9 KB