X1806-01 Wastewater Treatment Systems Replacement-Trail of Tears State Park

The project consists of selective demolition of two wastewater treatment facilities (WWTF) and replacing with new low pressure pipe systems. The work also consists of replacing a degraded storm sewer culvert with a new culvert.
  Issued for Bid (click to expand/collapse)
Name Date Size
00-Full PDF of Plans 12/22/2020 36.2 MB
01-G-001_Cover Sheet 12/22/2020 152.2 KB
02-G-002_Locator Index Survey Info 12/22/2020 1.1 MB
03-G-003_Notes Coordinate Table 12/22/2020 5.7 MB
04-C-101_Visitor Center Existing Site Plan 12/22/2020 605.0 KB
05-C-102_Visitor Center Existing Site Plan 12/22/2020 661.4 KB
06-C-103_Visitor Center Demolition Plan 12/22/2020 1.0 MB
07-C-104_Visitor Center Demolition Plan 12/22/2020 487.9 KB
08-C-105__Visitor Center Grading Plan 12/22/2020 697.3 KB
09-C-106__Visitor Center Grading Plan 12/22/2020 516.2 KB
10-C-107_Visitor Center Wastewater Plan & Profile 12/22/2020 1.2 MB
11-C-108_Visitor Center Stormwater Plan & Profile 12/22/2020 847.9 KB
12-C-109_Bath House Existing Site Plan 12/22/2020 659.2 KB
13-C-110_Bath House Existing Site Plan 12/22/2020 582.0 KB
14-C-111_Bath House Demolition Plan 12/22/2020 1.2 MB
15-C-112_Bath House Demolition Plan 12/22/2020 470.8 KB
16-C-113_Bath House Grading Plan 12/22/2020 550.8 KB
17-C-114_Bath House Wastewater & Stormwater Plan 12/22/2020 681.5 KB
18-C-115_Bath House Wastewater Plan 12/22/2020 485.2 KB
19-C-116_Bath House Wastewater Profiles 12/22/2020 750.8 KB
20-C-301_Visitor Center Cross Sections 12/22/2020 622.9 KB
21-C-302_Bath House Cross Sections 12/22/2020 722.9 KB
22-C-501_Wastewater System Details 12/22/2020 2.3 MB
23-C-502_Wastewater System Details 12/22/2020 924.0 KB
24-C-503_Sewer Details 12/22/2020 7.6 MB
25-C-504_Sewer Details 12/22/2020 4.5 MB
26-C-505_Open Channel & Road Details 12/22/2020 3.3 MB