X2307-02 Water & Wastewater Improvements-Lake of the Ozarks State Park

Water system improvements at Camp Rising Sun, Camp Pin Oak, Camp Clover Point, Camp Red Bud, the Outpost Cabins, and Homestead which include new mains, valves, tanks, & other water related improvements, including a new wastewater lift station & perforated discharge pipe at the McCubbins lagoon site.

Status

Accepting Bids

Prebid Date 10/2/24 10:00am
Bid Date 10/17/24 1:30pm

Company & Contacts

The State of Missouri Office of Administration
Lorena Villalobos  
573-751-3565

Location

Kaiser, MO

Documents can be ordered online or by contacting ADS at 1400 Forum Blvd, Suite 7A, Columbia, MO 65203, Ph: (573) 446-7768, Email: orders@adsmo.net.  A hard copy set of documents is available for a refundable deposit of $100, CHECK ONLY, payable to ADS and a copy can be emailed to us before you mail them.  A download is available for a purchase (non-refundable) of $50 that can be paid via credit card (you will see this option only when logged in).