City of Ava S. Spurlock Sidewalk Improvements
The proposed work involves reconstruction and construction of approximately 1,200 linear feet of sidewalk from south of Lincoln Ave. to Curry Ave on the west side of Spurlock St as well as from Spurlock St to Jefferson St on the south side of Garfield. The project will consist of curb and gutter, sidewalk, sidewalk ramps, street crossings, driveway approaches, seeding, erosion and traffic control. All equipment, material, and workmanship must be in accordance with the plans, specifications, and contract documents on file with the City of Ava.
Plan Holders
Date | Company | Contact | Bid Categories |
2/12/25 9:33 am |
A.T. Urban Development Inc.
6891 STATE HIGHWAY 125 S Chadwick, MO 65629 |
Rachel Smith
President
Tel: 417-634-0070
|
General Contractor |
1/29/25 12:53 pm |
Bartlett & West, Inc
1824 South Lone Pine Ave Suite F Springfield, MO 65804 |
Neil Brady
|
|
1/29/25 12:53 pm |
City of Ava
404 S Jefferson St Ava, MO 65608 |
Suzanne Welsh
|
|
1/31/25 11:32 am |
ConstructConnect
3825 Edwards Rd Suite 800 Cincinnati, OH 45209 |
Landie Acker
Research Analyst
Tel: 8774224665
Fax: (800) 467-2860
|
Planroom |
1/31/25 9:46 am |
Hessling Construction
12247 County Road 637 Dexter, MO 63841 |
Brad Hessling
Tel: 15736145850
Fax: 573-624-8054
|
General Contractor |
1/29/25 12:49 pm |
ePlan Online Planroom
1400 Forum Blvd. Suite 7B Columbia, MO 65203 |
ePlan Reporter
Tel: (573) 447-7130
Fax: (573) 355-5404
|