C2324-01 Upgrade HVAC-Ozark Correctional Center

The project includes converting the existing facilities central steam heating system to a localized natural gas heating system. New natural gas piping will be run underground to all of the existing buildings currently served by the steam system. From there, the heating system will be converted to localized gas-fired forced air furnaces, packaged outdoor rooftop units, gas-fired unit heaters, and electric duct/unit heaters. New air distribution systems will be installed for a few buildings. The domestic hot water systems in Housing Unit One, Housing Unit Two, Cafeteria, and Laundry will also be converted from steam heat exchangers to gas-fired tank-type water heaters and master mixing valves.

Status

Accepting Bids

Prebid Date 6/11/25 10:00am
Bid Date 6/26/25 1:30pm

Company & Contacts

The State of Missouri Office of Administration
Shannon Thompson  
573-257-7137

Location

Fordland, MO

Documents can be ordered online or by contacting ADS at 1400 Forum Blvd, Suite 7A, Columbia, MO 65203, Ph: (573) 446-7768, Email: orders@adsmo.net.  A hard copy set of documents is available for a refundable deposit of $100, CHECK ONLY, payable to ADS and a copy can be emailed to us before you mail them.  A download is available for a purchase (non-refundable) of $75 that can be paid via credit card (you will see this option only when logged in).