T2406-01 Replace HVAC & Exterior Repairs-Ike Skelton Training Site

Replacement of existing air handling units & fan coil units, and modifications to the attic spaces to improve the energy efficiency of the MEF Building.
Issued for Bid (click to expand/collapse)
Name Size
00-Full PDF of Plans 25.8 MB
01-G-001_Cover Sheet 580.4 KB
02-G-002_Code Analysis, General Notes and Site Plan 609.0 KB
03-S-001_Structural General Notes 636.1 KB
04-S-101_Existing Plans and Details 584.5 KB
05-A-101_Floor Plans and Details 679.1 KB
06-A-102_Roof Plan and Details 820.3 KB
07-A-103_Attic Plan and Details 733.0 KB
08-A-201_Building Elevations 829.0 KB
09-A-501_Vestibule Plans and Details Alt 1 and 2, Room Finish Schedule 799.4 KB
10-A-701_Demo - Reflected Ceiling Plans 794.8 KB
11-A-702_Reflected Ceiling Plans 838.7 KB
12-M-001_Mechanical General Notes 567.1 KB
13-M-101_Lower Level Mech Floor Plan Demo - Ductwork 580.3 KB
14-M-102_Lower Level Mech Floor Plan Demo - Piping 604.9 KB
15-M-103_Level 1 Mech Floor Plan Demo - Ductwork 611.4 KB
16-M-104_Level 1 Mech Floor Plan Demo - Piping 626.1 KB
17-M-105_Attic and Roof Mech Plan Demo 560.2 KB
18-M-106_Lower Level Mech Floor Plan New Work - Ductwork 600.1 KB
19-M-107_Lower Level Mech Floor Plan New Work - Piping 639.0 KB
20-M-108_Level 1 Mech Floor Plan New Work - Ductwork 1.3 MB
21-M-109_Level 1 Mech Floor Plan New Work - Piping 675.4 KB
22-M-110_Mech Roof and Attic Plan - New Work 632.3 KB
23-M-301_Mech Sections 564.1 KB
24-M-501_Mech Details 583.7 KB
25-M-502_Mech Details 580.9 KB
26-M-601_Mech Schedules 774.7 KB
27-M-602_Mech Schedules 1.0 MB
28-M-603_Mech Controls 669.2 KB
29-M-604_Mech Controls 716.6 KB
30-M-605_Mech Controls 736.8 KB
31-M-606_Mech Controls 711.0 KB
32-E-001_Electrical Symbols, Notes and One Line 823.2 KB
33-E-101_Lower Level Floor Plan 702.2 KB
34-E-102_Level 1 Floor Plan 760.9 KB
35-E-103_Roof Plan - Demo 660.2 KB
36-E-104_Roof Plan - Reno 1.1 MB
37-E-701_Reflected Ceiling Plans - Lighting Demo 836.9 KB
38-E-702_Reflected Ceiling Plans - Lighting Reno 930.0 KB