Warrensburg - Lions Lake Improvement
The draining & dredging Lions Lake, placement of removed sediment, trail improvements, sediment forebay construction, and the construction of a floating walkway with concrete retaining walls & landings, and wood framed bump outs on the existing bridge and all associated erosion control.
Issued for Bid
(click to expand/collapse)

Name | Size | ||
00-Full PDF of Plans | 21.4 MB | ||
01-C0.01_Cover | 867.9 KB | ||
02-C0.02_General Notes | 940.5 KB | ||
03-C1.01_Overall Plan | 3.5 MB | ||
04-C2.01_Grading Plan | 1.6 MB | ||
05-C2.02_Grading Plan | 1.4 MB | ||
06-C2.03_Grading Plan | 1.9 MB | ||
07-C2.04_Sediment Disposal Grading Plan | 1.4 MB | ||
08-C3.01_Erosion Control Plan | 3.7 MB | ||
09-C4.01_Details | 911.3 KB | ||
10-C4.02_Details | 812.4 KB | ||
11-S.1_Structural Drawing | 965.6 KB | ||
12-S.2_Structural Drawing | 4.7 MB |