O2427-01 Repl Multi Electronic Systems-George Washington Carver State Office Building
Demolition of existing fire alarm system, installation of new fire alarm system, startup & testing, and integration with owner's central monitoring service.
Issued for Bid
(click to expand/collapse)

Name | Size | ||
00-Full PDF of Plans | 20.6 MB | ||
01-G001_Title Sheet | 546.3 KB | ||
02-G002_Index Page | 3.4 MB | ||
03-FA100_Fire Alarm Plans - Basement | 3.1 MB | ||
04-FA101_Fire Alarm Plans - Level 1 | 3.2 MB | ||
05-FA102_Fire Alarm Plans - Level 2 | 3.2 MB | ||
06-FA103_Fire Alarm Plans - Level 3 | 3.2 MB | ||
07-FA111_Fire Alarm Plans - Warehouse | 3.2 MB | ||
08-FA500_Fire Alarm Details | 6.2 MB |