H2404-01 Replace HVAC, Multiple Assets-Fulton Treatment Center
Replacement of existing equipment with new equipment of a similar design. The new heating/cooling equipment will be a built up air handler with a heat pump & hydronic backup heat.
Specifications
(click to expand/collapse)

Name | Size | ||
01-Full Spec | 3.6 MB | ||
02-Division 00 | 3.1 MB | ||
03-Division 01 | 262.5 KB | ||
04-Division 03 | 25.8 KB | ||
05-Division 23 | 327.1 KB | ||
06-Division 26 | 236.1 KB |