Centralia Performing Arts Center

Approximately 18,500 SF addition to the existing Centralia High School. The project includes a 920 Seat auditorium, lobby, and associated support spaces. The project will be constructed of structural steel framing and a pre-engineered metal building, with concrete slab on grade and footings.
Date Company Contact
1760971394
10/20/25 9:43 am
Paragon Architecture
637 W College St
Springfield, MO 63108
Emily Biagioni-Paulette
Project Manager
Tel: 4178850002
1760971403
10/20/25 9:43 am
ePlan Online Planroom
1400 Forum Blvd.
Suite 7B
Columbia, MO 65203
ePlan Reporter
Tel: (573) 447-7130
Fax: (573) 355-5404