R2517-01 Update HVAC & Chiller-Crime Lab Building-Troop D Crime Lab
Replacement of the existing chilled water system, air handling unit, VAV terminal units, and mini-split systems. In addition, a second chiller will be installed to provide redundancy.
Specifications
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| 01-Full Spec | 8.6 MB | ||
| 02-Division 00 | 3.0 MB | ||
| 03-Division 01 | 914.7 KB | ||
| 04-Division 23 | 2.1 MB | ||
| 05-Division 26 | 836.2 KB |

