W2303-01 Replace Flooring & Renovate Front Entrance - Missouri Geological Survey-Buehler Building
Base Bid of replacement of flooring, asbestos remediation, removal of existing walls, wood casework, and service window. The project also consists of installing an interior storefront assembly, installing new metal stud walls, and installation of new service window within an existing wall.
Issued for Bid
(click to expand/collapse)

Name | Size | ||
00-Full PDF of Plans | 6.3 MB | ||
01-G-001_Cover | 94.3 KB | ||
02-G-002_Sheet Index & Site Maps | 1.6 MB | ||
03-ASB101_Asbestos Abatement Plan | 688.2 KB | ||
04-ASB501_Asbestos Abatement Details | 631.6 KB | ||
05-A-101_Demolition Plan | 750.7 KB | ||
06-A-102_Demolition Plan | 768.9 KB | ||
07-A-103_Renovation Plan | 779.5 KB | ||
08-A-104_Renovation Plan | 838.6 KB | ||
09-A-105_Reflected Ceiling Plans | 770.4 KB | ||
10-A-201_Publications Room Elevations | 613.9 KB | ||
11-A-202_Front Entrance Elevations | 739.3 KB | ||
12-A-401_furniture Plan | 1.1 MB | ||
13-A-501_Details | 690.9 KB | ||
14-A-601_Schedules | 776.4 KB | ||
15-F-101_Fire Protection Plan | 642.6 KB | ||
16-M-101_Mechanical Plan Main Floor | 1.0 MB | ||
17-E-101_Electrical Demolition Plan | 716.1 KB | ||
18-E-102_Electrical Renovation PLan | 707.3 KB |