W2303-01 Replace Flooring & Renovate Front Entrance - Missouri Geological Survey-Buehler Building

Base Bid of replacement of flooring, asbestos remediation, removal of existing walls, wood casework, and service window. The project also consists of installing an interior storefront assembly, installing new metal stud walls, and installation of new service window within an existing wall.
Specifications (click to expand/collapse)
Name Size
01-Full Spec 7.3 MB
02-Division 00 4.3 MB
03-Division 01 680.3 KB
04-Division 02 291.5 KB
05-Division 03 93.9 KB
06-Division 07 133.4 KB
07-Division 08 184.2 KB
08-Division 09 182.9 KB
09-Division 12 188.6 KB
10-Division 21 139.7 KB
11-Division 23 139.7 KB
12-Division 26 285.1 KB
13-Division 27 143.3 KB
14-Appendix A 2.0 MB