O2426-01 Rework Parking Lot & Sidewalks-George Washington Carver State Office Building
Removing & replacing the existing parking lot, mill & overlay of the existing drive around the building and providing storm water management for increase in pavement.
Issued for Bid
(click to expand/collapse)

Name | Size | ||
00-Full PDF of Plans | 18.6 MB | ||
01-G001_Cover Sheet | 327.2 KB | ||
02-C001_General Notes | 767.3 KB | ||
03-C002_Typical Section | 429.0 KB | ||
04-V101_Existing Conditions | 937.8 KB | ||
05-C101_Demolition Plan | 976.2 KB | ||
06-C201_Site Plan | 860.9 KB | ||
07-C301_Grading Plan | 1.2 MB | ||
08-C302_Erosion Control Plan | 1.2 MB | ||
09-C303_Erosion Control Details | 2.4 MB | ||
10-C304_Erosion Control Details | 2.6 MB | ||
11-C305_Erosion Control Details | 2.7 MB | ||
12-C306_Erosion Control Details | 3.3 MB | ||
13-C307_Pavement Profiles | 503.1 KB | ||
14-C401_ Utility Plan | 858.1 KB | ||
15-C701_Site Details | 624.8 KB | ||
16-C702_Site Details | 723.6 KB | ||
17-C703_Site Details | 3.4 MB | ||
18-E001_Electrical General Notes | 766.4 KB | ||
19-ED100_ Electrical Demo Plan | 516.5 KB | ||
20-E100_Electrical Site Plan | 657.1 KB | ||
21-E200_Lighting Photometric Plan | 592.1 KB | ||
22-E300_Electrical Details | 479.3 KB | ||
23-E400_Electrical Schedule | 507.9 KB |