O2426-01 Rework Parking Lot & Sidewalks-George Washington Carver State Office Building

Removing & replacing the existing parking lot, mill & overlay of the existing drive around the building and providing storm water management for increase in pavement.
Specifications (click to expand/collapse)
Name Size
01-Full Spec 26.8 MB
02-Division 00 1.3 MB
03-Division 01 1.5 MB
04-Division 02 89.0 KB
05-Division 22 85.9 KB
06-Division 31 197.3 KB
07-Division 32 324.3 KB
08-Division 33 75.4 KB
09-Appendix 1 688.2 KB
10-Appendix 2 13.4 MB
11-Appendix 3 5.4 MB
12-Appendix 4 618.3 KB