O2426-01 Rework Parking Lot & Sidewalks-George Washington Carver State Office Building
Removing & replacing the existing parking lot, mill & overlay of the existing drive around the building and providing storm water management for increase in pavement.
Specifications
(click to expand/collapse)

Name | Size | ||
01-Full Spec | 26.8 MB | ||
02-Division 00 | 1.3 MB | ||
03-Division 01 | 1.5 MB | ||
04-Division 02 | 89.0 KB | ||
05-Division 22 | 85.9 KB | ||
06-Division 31 | 197.3 KB | ||
07-Division 32 | 324.3 KB | ||
08-Division 33 | 75.4 KB | ||
09-Appendix 1 | 688.2 KB | ||
10-Appendix 2 | 13.4 MB | ||
11-Appendix 3 | 5.4 MB | ||
12-Appendix 4 | 618.3 KB |