X2325-01 Construct Roadway & Parking Lot-Deutschheim State Historic Site-Pelster House Barn
Clearing, grading, modular block wall, gates, vault installation, stormwater culverts, guardrail, and crushed limestone and concrete paving. The Owner will procure the precast vault restroom, and the Contractor will install in the location shown on the plans in accordance with the Manufacturer's recommendations. The Contractor shall obtain a Franklin County Entrance Permit prior to starting construction.
Issued for Bid
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| 00-Full PDF of Plans | 6.3 MB | ||
| 01-G-001_Cover Sheet | 213.9 KB | ||
| 02-G-002_Notes | 544.1 KB | ||
| 03-C-101_Plan Profile - Sta 0+00 to 2+56.13 | 555.6 KB | ||
| 04-C-102_Plan Profile - Sta 2+56.13 to 8+72.91 | 663.5 KB | ||
| 05-C-103_Plan Profile - Sta 8+72.91 to 12+63.44 | 548.0 KB | ||
| 06-C-301_Typical Cross Sections | 463.5 KB | ||
| 07-C-302_Storm Profiles | 496.2 KB | ||
| 08-C-303_Modular Block Wall Profile & Details | 430.0 KB | ||
| 09-C-501_Details | 517.9 KB | ||
| 10-C-502_Details | 4.0 MB |

