X2325-01 Construct Roadway & Parking Lot-Deutschheim State Historic Site-Pelster House Barn
Clearing, grading, modular block wall, gates, vault installation, stormwater culverts, guardrail, and crushed limestone and concrete paving. The Owner will procure the precast vault restroom, and the Contractor will install in the location shown on the plans in accordance with the Manufacturer's recommendations. The Contractor shall obtain a Franklin County Entrance Permit prior to starting construction.
Specifications
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| 01-Full Spec | 5.4 MB | ||
| 02-Division 00 | 3.6 MB | ||
| 03-Division 01 | 612.2 KB | ||
| 04-Division 02 | 134.0 KB | ||
| 05-Division 03 | 174.3 KB | ||
| 06-Division 31 | 297.2 KB | ||
| 07-Division 32 | 323.9 KB | ||
| 08-Division 33 | 144.0 KB | ||
| 09-Appendix A | 1.0 MB |

