T2507-01 Repairs to Interior/Exterior-Lebanon Readiness Center

The project consists of improvements to the interior and exterior of the Lebanon Readiness Center. Interior renovations include the replacement of wall finishes, floor coverings, damaged ceiling tiles, replacement of lighting fixtures with LED lights, and door hardware. Selective demolition of the existing restrooms will be required for the revised restroom layouts to include individual shower stalls. The scope of work will also include improvements to the existing mechanical, plumbing, and electrical systems. Improvements to the exterior include light demolition to restore the exterior dumpster enclosure, replacement of the LED wall packs, and fluid-applied roofing over the existing standing seam metal roof.
Specifications (click to expand/collapse)
Name Size
01-Full Spec 5.2 MB
02-Division 01 3.5 MB
03-Division 02 151.3 KB
04-Division 03 226.8 KB
05-Division 04 132.6 KB
06-Division 05 156.8 KB
07-Division 06 198.7 KB
08-Division 07 361.7 KB
09-Division 08 267.7 KB
10-Division 09 597.2 KB
11-Division 10 225.7 KB
12-Division 12 173.4 KB
13-Division 22 283.2 KB
14-Division 23 265.3 KB
15-Division 26 375.9 KB